󰅁

Step 8: Prepare for Lockout/Tagout Removal

󰅂

Before locks and tags are removed, the area and equipment must be prepped for reenergization. Follow the details of the lockout/tagout procedure to ensure that:

  • The equipment is operationally intact (e.g. all machine guards replaced) and all components are fully assembled.
  • The equipment’s controls are in a neutral position so that it will not start unexpectedly when energy is reconnected.
  • The equipment and work area are clear of all nonessential items (e.g. tools, spare parts, debris).
  • All personnel are clear and accounted for, safely located away from hazardous areas.