Home
Lockout Device Selection Tool
Easy OSHA Reference Tool
Intro to LO/TO
Hazard Control Program
Step-By-Step
Exceptions
Resources
About This App
Glossary
Verify that the system is properly isolated and locked out before beginning any work. Verification is the step which is most frequently skipped but it is crucial to establishing a safe work environment.
Attempt to start the equipment by engaging all activating controls. Return controls to the OFF position when testing is complete. Before testing, make sure: