Before lockout or tagout devices are removed and energy is restored to the machine or equipment, procedures shall be followed and actions taken by the authorized employee(s) to ensure the following:
The work area shall be inspected to ensure that nonessential items have been removed and to ensure that machine or equipment components are operationally intact.
1910.147(e)(2)(i)
The work area shall be checked to ensure that all employees have been safely positioned or removed.
1910.147(e)(2)(ii)
After lockout or tagout devices have been removed and before a machine or equipment is started, affected employees shall be notified that the lockout or tagout device(s) have been removed.
Each lockout or tagout device shall be removed from each energy isolating device by the employee who applied the device.
Exception to paragraph (e)(3): When the authorized employee who applied the lockout or tagout device is not available to remove it, that device may be removed under the direction of the employer, provided that specific procedures and training for such removal have been developed, documented and incorporated into the employer's energy control program. The employer shall demonstrate that the specific procedure provides equivalent safety to the removal of the device by the authorized employee who applied it. The specific procedure shall include at least the following elements: